Major Projects history
ASL are involved with numerous projects all across Hong Kong, directly and indirectly for the Highways Department and other departments such as Civil Engineering, Water and Drainage. The works involved removal and re-surfacing for term maintenance and emergency works, as well as supplying and laying materials on new projects.
ASL also work for numerous contractors and private clients all over Hong Kong, supplying and laying many types of bituminous materials as well as supplying materials for the contractors to lay themselves.
Architectural Services Department
- SSA503 ~ Design and Construction of Fire Services Training School Cum Driving Training School At Pak Shing Kok, Area 78, Tsueng Kwan O
Highways Department
- Route 3 – Tsing Long Highway
- HY/92/17 – West Kowloon Expressway – North Section
- 10/HY/97, 15/HY/98 & 18/HDFVY/98 – Term Maintenance Contracts
- 07/HY/2000 & 08/HY/2000 – Term Maintenance Conrtacts
- 07/HY/2001 – HyD Term Contract (2002-2005)
- 16/HY/2003 – Maintenance of High Speed Road in New Territories West and Kowloon
- 14/HY/2003 – Highways Department Term Contract (Kowloon City District 2004-2007)
- 20/HY/2004 – Maintenance of High Speed Road in New Territories East and Hong Kong Island
- 10/HY/2005 – Highways Department Term Contract – Management & Maintenance of Roads in Eastern & Southern Districts of Hong Kong
- 07/HY/2008 – Management and Maintenance of Road in Kowloon East Excluding High Speed Road
- 04/HY/2010 – Highways Department Term Contract (Management and Maintenance of Roads on Hong Kong Island excluding High Speed Roads 2011 – 2017)
- 07/HY/2011 – Highways Department Term Contract (Management and Maintenance of Roads in Sha Tin, Sai Kung and Islands Districts excluding High Speed Roads 2012 – 2018)
- 05/HY/2012 – Highways Department Term Contract (Management and Maintenance of High Speed Roads in New Territories East and Hong Kong Island 2013 – 2019)
- 05/HY/2017 – Highways Department Term Contract (Management and Maintenance of Roads in Kowloon East excluding Expressways and High Speed Roads 2018-2024)
- HY/2013/04 — Construction of the vehicular bridges and at-grade roads at the southern portion of HKBCF
- HY/2011/09 — Design and construction of the section of HKLR between the HKSAR boundary and Scenic Hill
- HY/2009/19 — Central – Wan Chai Bypass — Tunnel (North Point Section) and Island Eastern Corridor Link
- HY/2010/08 — Central – Wan Chai Bypass — Tunnel (Slip Road 8 Section)
- HY/2014/16 – Hiram’s Highway Improvement Stage 1
- HY/2012/08 – Tuen Mun – Chek Lap Kok Link Northern Connection Sub-sea Tunnel Section
Water Services Department
- 25/WSD/00 – Salt Water Supply
- 1/WSD/00(5) – Term Contract (2002-2003)
- 11/WSD/01 – Diamond Hill Reservoir Works
- 1/WSD/02(L) – Term Contract –Lantau & Outlying Islands 2002 – 2005
- 4/WSD/05 – Replacement and Rehabilitation of Water Mains Stage 1 Phase 2 Mains in Kowloon City, Wong Tai Sin and Kwun Tong
- 7/WSD/06 – Main laying along Mount Davis Path and Victoria Road
- 3/WSD/08 – Replacement & Rehabilitation of Water Mains Stage 3 – Mains in West Kowloon (Package A)
- 10/WSD/08 – Replacement & Rehabilitation of Water Mains Stage 3 – Mains in Central & Western District
- 14/WSD/08 – Replacement of Rehabilitation of Water Mains Stage 3 – Mains in Tuen Mun & Yuen Long
- 15/WSD/08 – Replacement of Rehabilitation of Water Mains Stage 3 – Mains in Tai Po and Shatin
- 08/WSD/08 – Replacement and Rehabilitation of Water East Kowloon Mains, Stage 3 Mains in East Kowloon Ltd. (Package B)
- 9/WSD/08 – Replacement and Rehabilitation of Water Mains Stage 3 – Main in Hong Kong Island East
- 19/WSD/08 – Replacement and Rehabilitation of Water Mains Stage 3 – Main in Wai Chai
- 20/WSD/08 – Replacement and Rehabilitation of Water Mains Stage 3 – Mains in Hong Kong Island East
- 24/WSD/08 – Main Laying Along Castle Peak Road, Hung Shui Kiu, Tin Shui Wai, Ping Ha Road, Ping Shan and Tong Yan San Tsuen
- 6/WSD/08 – Replacement and Rehabilitation of Water West Kowloon Mains, Stage 3 Mains in West Kowloon Construction Co. (Package B)
- 1/WSD/08(K) – Term Contract for Waterworks, District K – Kowloon
- 1/WSD/09 – Term Contract for Waterworks, District E – New Territories East
- 1/WSD/09(W) – Term Contract for Waterworks, District W – New Territories West
- 12/WSD/10 – Replacement and rehabilitation of water mains, stage 4 phase 1 – mains in Eastern and Southern Districts
- 9/WSD/11 – Uprating of Wan Chai Salt Water Supply Wan Chai and Central mid- System – Mainlaying
- 13/WSD/11 – Replacement and rehabilitation of water mains, stage 4 phase 2, mains in East Kowloon
- 14/WSD/11 – Replacement and rehabilitation of water mains, stage 4 phase 2 – mains in West Kowloon
- 3/WSD/12 – Replacement & Rehabilitation of Water Mains, Stage 4 Phase 1, Remaining Mains at Hong Kong Island
- 1/WSD/14 (K) ~Term Contract for Waterworks District K – Kowloon ~ Contract Period 1.9.2014 – 31.8.2017
- 1/WSD/12 (H) ~Term Contract for Waterworks District H – Hong Kong Island and Ap Lei Chau ~ Contract Period 1.9.2012 – 31.8.2015
- 14/WSD/10 – Replacement and Rehabilitation of Water Mains, Stage 4 Phase 1 – Mains in East Kowloon
- 13/WSD/16 – Mainlaying in Tseung Kwan O
- 2/WSD/17 – Term Contract for Risk-Based Improvement of Water Mains – Kowloon and New Territories East
- 3/WSD/17 – Term Contract for Risk-Based Improvement of Water Mains – Hong Kong & Islands and New Territories West
- 1/WSD/17(K) – Term Contract for Waterworks District K- Kowloon – Contract Period 1.9.2017 31.8.2020
- 1/WSD/18(L) – Term Contract for Waterworks District L – Lantau and the Outlying Islands Contract Period 1.9.2017 – 31.8.2020
- 1/WSD/18(H) – Term Contract for Waterworks District Hong Kong Island and Ap Lei Chau Contract Period 1.9.2018 – 31.8.2021
Drainage Services Department
- DC98-21 – West Kowlooon Drainage Imp. Stage 2 Ph.2
- DC/99/05 – West Kowloon – Phase 2
- DC2001-04 – Lower Catchment for Central,Wanchai West
- DC/2001/06 – Village sewage works
- DC2001-01 – Shatin Sewage Treatment
- DC/2006/16 – Improvement works for Ma On Shan Area 108 Sewage Pumping Station and Sewage along Che Kung Miu Road
- DC/2007/21 – Construction of Sha Tin Sewage Treatment Works Stage III Extension Final Phase
- DC/2011/05 – Lam Tsuen Valley Sewerage – Village Sewerage, Stage 1
- DC/2010/06 – Upgrading of Central and East Kowloon Sewerage – Phase 2
- DC/2016/01 – Construction of Additional Sewage Rising Main and Rehabilitation of the Existing Sewage Rising Main between Tung Chung and Siu Ho Wan
- DC/2013/01 – Tolo Harbour Sewerage of Unsewered Areas, Stage 2 Phase 1
Civil Engineering & Development Department
- CV/2000/09 – Penny’s Bay
- CV/2001/11 – Yam O
- KL/2008/07 – Kai Tak Development Stage 1
- TK/2008/01 – TKO Further Development – Site Formation and Infrastructure work at Pak Shing kok
- HK/2009/02 – Wan Chai Development Phase II
- CV/2012/09 – Liantang/ Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works – Contract 3
- KL/2011/01 ~ Kai Tak Development – Reconstruction and Upgrading of Kai Tak Nullah
- HK/2012/08 ~ Wan Chai Bypass at Wan Chai West
- CV/2015/03 ~ Formation, Roads and Drains in Area 54, Tuen Mun
- NE/2016/01 ~ Site Formation and Infrastructure Works for Development of Anderson Road Quarry (ARQ) Site
- CV/2016/07 ~ Queen’s Hill Development – Road and Drainage Works (ECC Opt B)
Mass Transit Railway (MTR) / Kowloon Canton Railway (KCR)
- MTRC Contracts 601, 602, 605 & 615
- 580 – Yam O Station, Penny’s Bay Line
- KCRC CC-202 – West Section Alignment
- KCRC CC-204 – Long Ping Station
- KCRC CC-214 – Tuen Mun Station
- KCRC CC-402 – Nam Cheong Station
- MTRC908 Wong Chuk Hang Depot Superstructure
- KET 705 ~ KET Station & Overrun Tunnel
- 810B – Express Rail Link, West Kowloon Terminus Station South
- 810A – Express Rail Link, West Kowloon Terminus Station North
Tunnels & Bridges
- Re-lay bituminous surfacing at West Kowloon Side of WHT
- Resurfacing works for the year of 2003 at Eastern Harbour Tunnel
Private / Misc. Contracts
- HK11/01 – Central Pier 4-6
- Cyber-Port Rd.L1&D1
- SSH363 Science Park
- NL7/96 – Tung Chung
- TK54/01 TKO Road
- EP/SP/39/01 Kwun Tong Sai Tso Wan Recreation G/Project
- 20031013L10 PAH Resurfacing works at Sai Yung Pun
- HKHA48 of 1999 – Tung Tau Estate
- FL/27/02 – Upper River Indus Man Kam To Road
- WK/37/02 – West Kowloon Reclamation
- Supply and lay Stone Mastic Asphalt Reinstatement for The Hong Kong & China Gas Company Limited
- Tanner Hill Retirement Housing Development at 8 Tanner Road, North Point, Hong Kong
- Resurfacing works for Western Harbour Tunnel
- Resurfacing Works at NWTI Airport Bound ~ TIML MOM Limited
- HA20130375 ~ Construction of the Public Rental Housing Development at San Po Kong
- J3703 ~ L1 Contract For Lyric Theatre Complex and Extended Basement
Airport Authority
- P561 ~ North Commercial District Enabling Works
- P575 ~ NCD Main Infrastructure Works
- 3801 ~ APM and BNS Tunnels on Existing Airport Island
- 3503 – Three Runway System Project Terminal 2 Foundation and Substructure Works
Road markings
- Highways Department 05/HY/2017 – Highways Department Term Contract (Maintenance of Roads in Kowloon East 2018-2024)
- Highways Department HY/2011/09 ~ Design and construction of the section of HKLR between the HKSAR boundary and Scenic Hill
- Architectural Services Department – HOS Development at Ching Hong Road
- Airport Authority – M787 – 5 ~ Hong Kong Airport Landside
- Airport Authority – P533 – Midfield Works
- Airport Authority – P547 Temporary Parking Stands
- Private – Disneyland
- Private – Sai Kueng, Hong Hay Villa Private Road
- Private – TIML MOM Limited ~ CRA4 Airport Bond
- Private – West Harbour Tunnel